Skip to content (Press Enter)
  • Home
  • Solutions
  • Contacts
  • About the company
  • UA
  • Home
  • Solutions
  • Contacts
  • About the company
  • UA

Month: November 2021

The final stage of Weigh-In-Motion system building

11.11.202126.07.2022 integral-adm

According to the contract with the Chernihiv highway service, “INTEGRAL SYSTEMS” LLC completed the design, construction, installation and commissioning works of the weighing-in-motion system

Read More

Continue performing of Weigh-In-Motion system building

01.11.202126.07.2022 integral-adm

Works continue on the construction of the weighing system in motion on the M-21 and M-06 roads – supporting metal structures have been installed, and the road surface has been replaced. Works are underway to connect electricity and a cable optical Internet channel for data transmission from the system to the customer.

Read More

Недавні записи

  • Construction work at the Rivne airport
  • The final stage of Weigh-In-Motion system building
  • Continue performing of Weigh-In-Motion system building

Останні коментарі

No comments to show.

Archive List

  • July 2022
  • November 2021

Recent Posts

  • Construction work at the Rivne airport
  • The final stage of Weigh-In-Motion system building
  • Continue performing of Weigh-In-Motion system building

Categories

  • Без категорії

Tags

© 2026 INTEGRAL SYSTEMS. All Rights Reserved. Plumber Workshop By Themeignite. Powered By WordPress.