Skip to content (Press Enter)
  • Home
  • Solutions
  • Contacts
  • About the company
  • UA
  • Home
  • Solutions
  • Contacts
  • About the company
  • UA

Category: Без категорії

Construction work at the Rivne airport

19.07.202226.07.2022 integral-adm

At the Rivne airport, INTEGRAL SYSTEMS LLC continues construction work on the installation of foundations for ILS system under the current contract. The builders prepared pits, rammed the crushed stone-sand mixture of the foundation pillow, and performed waterproofing of the wells

Read More

The final stage of Weigh-In-Motion system building

11.11.202126.07.2022 integral-adm

According to the contract with the Chernihiv highway service, “INTEGRAL SYSTEMS” LLC completed the design, construction, installation and commissioning works of the weighing-in-motion system

Read More

Continue performing of Weigh-In-Motion system building

01.11.202126.07.2022 integral-adm

Works continue on the construction of the weighing system in motion on the M-21 and M-06 roads – supporting metal structures have been installed, and the road surface has been replaced. Works are underway to connect electricity and a cable optical Internet channel for data transmission from the system to the customer.

Read More

Search

Archive List

  • July 2022
  • November 2021

Recent Posts

  • Construction work at the Rivne airport
  • The final stage of Weigh-In-Motion system building
  • Continue performing of Weigh-In-Motion system building

Categories

  • Без категорії

Archive List

  • July 2022
  • November 2021

Recent Posts

  • Construction work at the Rivne airport
  • The final stage of Weigh-In-Motion system building
  • Continue performing of Weigh-In-Motion system building

Categories

  • Без категорії

Tags

© 2025 INTEGRAL SYSTEMS. All Rights Reserved. Plumber Workshop By Themeignite. Powered By WordPress.